How this stage unfolds
What happens on site?
Visible construction work and the documents recording specific events are connected, but they are not the same thing. Check each separately.
Before the excavation, there is work that is almost invisible from the street: geodetic surveying, field surveys, baseline data, assignments and development of the project parts. The architectural solution is coordinated with construction, installations, access, fire safety and other requirements for the specific construction.
During this period, the advertisement preview may change because not every solution shown is necessarily part of a final approved project. Lack of physical activity does not necessarily mean lack of preparation, and a fence or clearing of the field does not in itself prove a permitted construction.
For the buyer
Why does it matter to the buyer?
This is where the basic conditions for future construction are defined: what may be built, how access will be provided, which restrictions apply and on what basis the developer has the right to build. A discrepancy in the site, phase or project version may mean that the advertised layout does not match the approved project.
It is also important for the buyer to know what has not yet been decided. The early draft carries more unknowns; they should be reflected in the way you compare bids, review contracts, and plan timelines and costs.
An architect or engineer can read layout specifications and design constraints and tell the difference between an idea, an approved part, and an actual implementation. A land surveyor is suitable for boundary and land identity issues.
An independent lawyer verifies the real rights and conditions in the contract. The municipality maintains the relevant planning and construction files, but the administrative reference does not replace the legal verification of the specific case.
Before relying on this stage
What do you need to clarify?
Identify the exact land parcel, the developer and the legal basis for the right to build. Ask for a clear distinction between the PI, the UPI, the individual phases and the unit being offered.
Find out which version of the project you're seeing and which parts have already been approved. Ask how access, parking, common areas and external connections are dealt with, rather than taking it from the ad scheme.
Checklist
Use this list when speaking with the seller or a specialist. A tick only records your progress; it does not verify the condition of the property or the works.
- 01
Compare PI, UPI, address, neighborhood, boundaries and purpose; note any difference that needs to be explained.
- 02
Ask for the documents that show the ownership of the land or the right to build, and review them with an independent lawyer.
- 03
Determine whether the offer is for a specific phase, block and future unit, rather than only a trade name for the complex.
- 04
Compare the advertised layout and specification with the current project version, and keep the version that will be attached to the contract.
- 05
Ask which elements - access, landscaping, parking and connections - are in the same project and which depend on separate procedures.