How this stage unfolds
What happens on site?
Visible construction work and the documents recording specific events are connected, but they are not the same thing. Check each separately.
The site is organized, the building is laid out according to the determined lines and levels, and earthworks begin. Depending on the terrain, strengthening, drainage, excavation, sub-layers, foundations and underground parts can be performed.
Some of the works soon become invisible under subsequent layers. Therefore, the construction process uses specialized acts and protocols for hidden works and controlled levels; the site visitor cannot replace them with just a photo.
For the buyer
Why does it matter to the buyer?
The exact positioning and construction of the foundations affect the entire building. The opening protocol helps identify which permit is being implemented and when, but it must refer to the correct block or phase.
If the contract links payment to "commencement of construction", check how this term is defined. A marketing announcement, ground breaking and the applicable building protocol can be different events.
The construction supervisor and technical supervisor have roles in the construction process and documentation. An independent engineer can explain the visible works and what should normally be documented.
The lawyer reviews the contractual meaning of the event and whether the evidence presented conforms to the clause. Don't expect the technical specialist to give a legal opinion or the lawyer to accept the quality of the foundations.
Before relying on this stage
What do you need to clarify?
Determine which event has occurred: an open site, defined line and level, excavation started or foundations completed. Then check how this event relates to the permit and phase of your property.
If the contract uses this stage, read which document must be presented, who notifies the buyer and whether there is a deadline or right to check before further action.
Checklist
Use this list when speaking with the seller or a specialist. A tick only records your progress; it does not verify the condition of the property or the works.
- 01
Compare the permit number, developer, construction description and phase in the protocol.
- 02
Check the date and scope of the opening without assuming that a document for one building covers the entire complex.
- 03
Ask who exercises construction supervision, who keeps the order book and where applicable construction documents are kept.
- 04
On inspection, distinguish the visible work from the authenticated event and note what cannot be seen after its closure.
- 05
If there is a payment, read the exact contract clause and ask for the exact proof specified in it.