Documents

Understand what each document proves

See when it is used, which details to compare and what you cannot conclude from that document alone.

Planning and construction

How is a project planned, authorised and accepted?

Plans, designs, permits and acceptance documents: what each proves and when it is needed.

Design permit (visa)

An extract from the current development plan with design parameters for a particular property. It is an important starting point, but does not authorize construction.

Detailed development plan (PUP)

The plan that governs the boundaries, purpose and development of a given territory. It is a basis for design, but does not endorse a specific building.

Approved investment project

The approved design documents on which the building permit is based and against which construction must be carried out. They show the layout and technical solutions.

Building permit

The administrative act authorizing a precisely described construction project under specified conditions and approved designs. It is important, but not sufficient for a complete check.

Construction site opening protocol

Certifies the opening of the construction site and the determination of the construction line and level when this protocol is required for the construction.

Act Form 14

Certifies acceptance of the building's structural frame. It is not final acceptance and does not, on its own, confirm that every condition for the legally defined rough-construction stage has been met.

Rough-construction stage certificate

Official document for the "rough construction" degree reached under Art. 181 ZUT. It is especially important when transferring an object before the building is completed.

As-built documentation

It reflects the permissible insignificant deviations between the approved project and the actual construction.

Act Form 15

A record stating that the construction is ready for acceptance. It describes the work and supporting documents, but does not authorize use of the building.

"Act 16" and commissioning

"Act 16" is a colloquial name for various documents. It is important to distinguish between the Form 16 Protocol, the use permit and the commissioning certificate.

Technical passport of the building

It collects the main technical characteristics, the inspections carried out and the measures for maintaining the building. Does not guarantee that it is free of defects.

Certificate of energy performance

An official assessment of the building's energy performance at a specific point in time. It indicates likely performance and costs, but does not predict your individual bills.

Certificate of tolerance

A document for certain older buildings constructed without the required papers but meeting the statutory conditions for tolerance. It is not a building permit or use permit.

Property and ownership

What is being sold, and who may transfer it?

Compare the exact property description, title documents, registrations and the seller's authority. One document rarely answers every question.

Contracts and finance

What obligations do you take on before completion?

Reservation, brokerage, the preliminary contract and the bank valuation serve different purposes and do not replace one another.

Handover and management

What happens after you receive the keys?

Documents covering condition, defects, warranties, charges and building management.