How this stage unfolds
What happens on site?
Visible construction work and the documents recording specific events are connected, but they are not the same thing. Check each separately.
The permit creates the administrative possibility to carry out the described construction, but there may not yet be substantial work on the ground. Organization of the site, determination of the participants and fulfillment of the requirements for a lawful start are pending.
Visible clearing, fencing or delivery of machinery does not in itself indicate that construction has commenced in accordance with the applicable order. Also, the permit date does not allow the current physical progress to be calculated.
For the buyer
Why does it matter to the buyer?
The permit sets the legal and design identity of the permitted construction. A difference in developer, UPI, block, phase, purpose or project number may make the document inapplicable to the property you are looking at.
For an early stage purchase, this document is the starting point for the contract and attachments. It helps to ask the right questions, but it should be linked to the rights of the seller, the project specification and the terms of payment.
The issuing authority and the municipality maintain the administrative file. An architect or engineer can compare the permit with the design parts and recognize changes in the technical scope.
An independent lawyer monitors the rights of the developer and the seller and the relationship between the permitted construction and the contract. Neither the broker nor the investor's employee is a substitute for this independent verification.
Before relying on this stage
What do you need to clarify?
Find out who the developer is, how the construction is described and which project sections have been approved. Trace the link to the exact UPI/PI and to the block or phase containing the future unit.
Ask if there are subsequent orders or changes and how they affect the layout, area, purpose, common areas and terms described in the offer and contract.
Checklist
Use this list when speaking with the seller or a specialist. A tick only records your progress; it does not verify the condition of the property or the works.
- 01
Compare the developer, UPI/PI, address, construction description, block, stage and construction category.
- 02
Request verifiable entry into force data and a list of any subsequent additions, amendments or recertifications.
- 03
Link the number and date to the design version that describes the specific apartment and will be attached to the contract.
- 04
Check who the builder, designers and construction supervisor are without confusing their responsibilities.
- 05
If the document is found by cadastral identifier, read the scope itself; a search match does not in itself prove applicability.