How this stage unfolds
What happens on site?
Visible construction work and the documents recording specific events are connected, but they are not the same thing. Check each separately.
Once the structural frame is complete, work continues in parallel on masonry and partition walls, roof and façade layers, windows and doors, and the electrical, plumbing, heating, ventilation and other building systems. Lifts, stairways, corridors, garages, landscaping and access may progress at different rates.
Different blocks and parts can be at different levels of readiness. A visibly finished facade can coexist with unfinished common parts or untested installations, and the works in the particular apartment do not show the state of the entire construction.
For the buyer
Why does it matter to the buyer?
Here the promised quality starts to become visible. The agreed degree of completion should describe not only floors and walls in the apartment, but also common areas, installations, facade, parking and surrounding environment.
Vague terms such as "turnkey" or "luxury common areas" have little value without a detailed specification. Differences may result in extra costs, delay or disputes at handover.
An independent structural engineer or relevant installation specialist can assess the apparent performance and indicate what requires separate testing. Operators and competent authorities only confirm procedures within their scope.
The lawyer compares the agreed specification, terms and remedies. The technical and legal assessments must align, especially when payment is linked to a broadly described physical stage.
Before relying on this stage
What do you need to clarify?
Clarify exactly what will be done in the home, the common areas and the outdoor environment and who will cover the cost of the rest. Compare the description in the contract, the technical specification and the current condition on site.
Ask which utility connections are permanent, which procedures remain incomplete and whether any infrastructure serves more than one phase. Do not treat a promised deadline as an established fact without documentary evidence.
Checklist
Use this list when speaking with the seller or a specialist. A tick only records your progress; it does not verify the condition of the property or the works.
- 01
Compare the technical specification, design solutions and visible performance for the housing, common areas and parking.
- 02
Record which works are complete, which are in progress, and which cannot be judged by visual inspection alone.
- 03
Ask which utility connections are permanent, which procedures remain incomplete and who is responsible for them.
- 04
Distinguish the documents for the residential building from the permits and protocols for the substation, street, water supply or other infrastructure.
- 05
Check how the contract describes the permissible changes, the quality, the deadline for fixing defects and the proof of the stage.