Document · Planning and construction

Rough-construction stage certificate

Official document for the "rough construction" degree reached under Art. 181 ZUT. It is especially important when transferring an object before the building is completed.

The short answerThis certificate reflects that the construction has reached the stage of "rough construction" for the purposes of the applicable regime under Art. 181 ZUT. It is of particular importance when, after this degree, the constructed building or individual parts of it are transferred, instead of just the right to build. The document is not just another name for Act 14. Act 14 accepts the construction between the participants in the construction, while the certificate serves before third parties and in transactions to prove the degree reached according to the competent certification.
When will you need it?

The certificate is important after the completion of the building in rough construction and before a notarial transfer with a specific unfinished object, when the type of transferable right depends on the degree reached.

Who issues or signs it?

It is issued or certified by the competent administration according to the applicable order based on the construction documents and the established degree. The specific form and authority should be checked for the relevant building and municipality.

Why does it matter to the buyer?

Prior to rough construction, the buyer often acquires or is promised a right to build; after the degree reached, the subject may be treated differently. An inaccurate description can result in a contract for a different right than what the buyer thinks they are acquiring.

What the document proves

What can you establish from it?

Each document answers a different question. A single document is rarely enough to prove title, completed construction work and the basis for payment at the same time.

What does it establish?

Establishes the officially certified degree of completion for the specified construction and scope as of a specified date. The exact text indicates whether it refers to the whole building, a stage or another part.

What does it not establish?

It does not prove commissioning, habitability, completed installations, cadastral registration, ownership by the seller or the absence of encumbrances. It does not decide by itself what is written in the preliminary contract.

What to look for in the document

Which details should you compare?

Compare the construction, permit, block and stage, date, issuer, legal basis, Act 14 and details of the future unit. Check how the property and the right to it are described in the preliminary contract and the draft deed.

Place in the process

What comes before and after?

It is preceded by construction and acceptance of the structural frame. Once this stage is certified, a notarial transfer and cadastral procedures may be possible while work continues towards Act 15 and commissioning.

Where the document comes from

Finding and checking it

Can Mesto find it?

Mesto cannot reliably obtain this rough-construction certificate in every case. Information about Act 14 or visible progress does not prove that the separate certificate has been issued.

Where should you check or request it?

Ask for a certified copy from the seller or contractor and confirm with the competent administration. For a notarial transaction, check with the notary in advance which document and form will be required.

One last check before you decide

When do you need a professional review?

A lawyer and a notary must compare the certificate with the property right and the draft transaction. An engineer is helpful if there is doubt as to whether the physical and documentary degrees match.

Before you continue

Check these details

Use this list to prepare for a conversation with the seller or a specialist you trust.

  1. 01

    Do not accept Act 14 as an automatic substitute for the certificate.

  2. 02

    Verify that the authenticated scope includes the correct block and stage.

  3. 03

    Compare the document with the subject of the notarial transfer.

  4. 04

    Clarify whether you are acquiring the right to build or an already built self-contained unit.

Sources

Check the official source

This content is educational and does not replace a qualified professional's review of the documents for a specific property.

Version 1 · The content is published but has not yet been reviewed by a specialist.