Example
What does it look like in practice?
Scratched woodwork and missing contact are visible on delivery and described. A leak behind a lining or improperly executed waterproofing can appear after the first heavy rain.
In both cases, the photo is useful, but establishing the technical cause and the person responsible may require a specialist.
What is it commonly confused with?
Signing a handover protocol should not automatically be understood as a confirmation that there are no hidden problems. Conversely, the notice list does not necessarily mean that the buyer can unilaterally refuse any payment or acceptance.
Aesthetic defect, incomplete contract work and structural defect have different consequences and require different response.
Why does it matter?
For the buyer, early detection and accurate documentation reduces cost and cause dispute. Missing a visible defect can make it harder to prove, and improperly addressing a hidden problem can destroy evidence.
The common parts deserve a separate look, because a defect there can affect many objects and the future budget of the condominium.
What to ask
What should you check next?
Perform technical inspection against project and contract specification, describe location, size and symptom and attach dated photographs. Clear timelines for removal, access and re-examination in the protocol, without vague phrases about a complete waiver of future claims.
If a problem occurs later, document prior to repair, reportable and seek independent technical and legal assistance as appropriate.